Untitled
Abstract: No abstract text available
Text: 16 15 14 13 12 11 a 10 SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL O DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. an22.78 M MISSING SYMBOLS TOTAL NO OF INSPECTIONS REQUIRED 1 -2 8 12 28 LAST NO.
|
OCR Scan
|
PW706
04MY06
Z9AU05
28JN05
|
PDF
|
12040927
Abstract: No abstract text available
Text: 12 11 $ B 10 SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTIONIT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. H M IS S IN G TOTAL NO OF INSPECTIONS REQUIRED LAST NO. USED 40 SYMBOLS NO M I S S I N G
|
OCR Scan
|
110C05
04MY06
1BAU04
51X10
12040927
|
PDF
|
Untitled
Abstract: No abstract text available
Text: 16 15 14 13 12 11 I 10 S SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M MISSING SYMBOLS TOTAL NO OF INSPECTIONS REQUIRED LAST NO. USED 43 NO M I S S I N G
|
OCR Scan
|
03MY06
PE154823
0ZJn-19d<
|
PDF
|