Untitled
Abstract: No abstract text available
Text: 12 11 10 B MISSING SYMBOLS SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTIONIT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. H TOTAL NO OF INSPECTIONS REQUIRED 16 LAST NO. USED 12 NO MISSING SYMBOL NUMBER
|
OCR Scan
|
07JA05
24JL06
02AU06
2BJA08
|
PDF
|
M3469007
Abstract: No abstract text available
Text: Zt B I SYMBOL D E FIN ITIO N A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. MISSING SYMBOLS TOTAL NO OF INSPECTIONS REQUIRED NO MISSING SYMBOL NUMBER 5 LAST NO. USED
|
OCR Scan
|
02AU06
07-Aug-06
M3469007
|
PDF
|
Untitled
Abstract: No abstract text available
Text: 12 11 10 B MISSING SYMBOLS SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. H CD 11 LAST NO. USED 10 NO MISSING SYMBOL NUMBER DATE STG REV N/P CHG ZONE
|
OCR Scan
|
26FE04
2B0C04
1B0C05
|
PDF
|
Untitled
Abstract: No abstract text available
Text: 12 11 £ SYMBOL DEFINITION B 10 A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTIONIT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. H MISSING SYMBOLS TOTAL NO OF INSPECTIONS REQUIRED LAST USED NO. DWG STATUS DATE STG REV N/P CHG
|
OCR Scan
|
1BMR04
02AU06
12-Sep-Q6
|
PDF
|
Untitled
Abstract: No abstract text available
Text: 16 15 14 13 12 11 $ 10 S MISSING SYMBOLS SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M TOTAL NO OF INSPECTIONS REQUIRED 17 LAST NO. USED 17 DWG STATUS
|
OCR Scan
|
26FE04
180C05
02AU06
26JN99
27JN99
|
PDF
|